AI deployments · powered shells to full campuses
Your AI deployment, delivered as a product.
From a powered shell to a full campus, Big Star delivers exactly what your deployment needs to go live.
Three ways to deploy.
Powered Shell
An energized building on secured power, ready for your own IT fit-out.
Modular Data Center
Factory-built modules with power and cooling integrated, delivered to a prepared site and ready for compute.
Full Campus
A complete site built out in phases, scaled to your capacity plan.
Your building, energized and ready.
A finished building on secured utility power, with the site, utility connection, and core infrastructure in place. Your team brings the racks, cooling, and compute, and fits out the hall to its own design.
Factory-built capacity, ready for compute.
Prefabricated modules arrive with power distribution and cooling integrated, tested at the factory and set on a prepared pad. Modules sit side by side, so capacity grows one unit at a time.
One site, built out to your plan.
A complete campus planned from the substation out, with land, power, buildings, and modules under one master plan. Phase one goes live first, and each later phase follows your capacity plan.
Tell us what you need to power.
Secured power, allocated in order of commitment. Your platform, your megawatts, your timeline. We come back with a site match and a delivery schedule.