AI deployments · powered shells to full campuses

Your AI deployment, delivered as a product.

From a powered shell to a full campus, Big Star delivers exactly what your deployment needs to go live.

Entry points

Three ways to deploy.

Powered Shell

An energized building on utility power, ready for your own IT fit-out.

Modular Data Center

Factory-built modules with power and cooling integrated, delivered to a prepared site and ready for compute.

Full Campus

A complete site built out in phases, scaled to your capacity plan.

Powered Shell

Your building, energized and ready.

A finished building on utility power, with the site, utility connection, and core infrastructure in place. Your team brings the racks, cooling, and compute, and fits out the hall to its own design.

UTILITY POWER CORE INFRASTRUCTURE YOUR IT FIT-OUT
Start the conversation
Powered shell Energized · ready for fit-out Open data hall Your racks and cooling Utility power in place DG-8 · Building, power, and site infrastructure delivered
Modular Data Center

Factory-built capacity, ready for compute.

Prefabricated modules arrive with power distribution and cooling integrated, tested at the factory and set on a prepared pad. Modules sit side by side, so capacity grows one unit at a time.

Direct liquid cooling container
Total IT power
580 kW
GPU capacity
320
GPU server space
168U
Air-cooled network and storage
42U
Immersion cooling container
Total IT power
400 kW
GPU capacity
1,024
GPU server space
256U
PUE
< 1.05

Built by our subsidiary BiXBiT USA. Published BiXBiT USA specifications.

FACTORY-TESTED INTEGRATED POWER INTEGRATED COOLING
Start the conversation
Modular data center Factory-built · ready for compute Coolers beside the module Compute module Integrated power skid DG-9 · Modules set side by side on a prepared pad
Full Campus

One site, built out to your plan.

A complete campus planned from the substation out, with land, power, buildings, and modules under one master plan. Phase one goes live first, and each later phase follows your capacity plan.

MASTER-PLANNED PHASED BUILD-OUT ONE COUNTERPARTY
Start the conversation
Full campus One master plan · built in phases Substation and power spine Phase 1 built Later phases planned DG-10 · Site, substation, and buildings on one campus
Live compute

Racks energized, monitored, and yours.

Every path ends the same way: liquid-cooled racks on utility power, watched around the clock.

Liquid-cooled AI compute rack lit against a dark background Illustrative rendering
Capacity

Tell us what you need to power.

Power, allocated in order of commitment. Your platform, your megawatts, your timeline. We come back with a site match and a delivery schedule.